The Brief

This project consisted of a warehouse conversion for medical equipment company, Asteral, producing their first ‘Centre of Excellence’ in the UK. Area were employed to undertake all planning applications for change of use conversions from Industrial to office space and conduit a full electrical survey and calculation to apply for a new mains electrical power upgrade.

Location
Theale, West Berkshire
Sq Ft
30,000 sq ft

 

The Solution

Our client required the creation of cellular offices on both ground and first floor of the newly installed mezzanine within the existing warehouse space. This consisted of the installation of full height glazed external entrance and ground works and the installation of new services for office and adjacent logistics, repair and testing facilities.

Key Challenges

To ensure this project was delivered successfully, management of new mains upgrades was a key consideration. During this project, we understood the client had a tight budget and programme constraints over the Christmas shutdown period. All works were undertaken whilst the client was in occupation which required strict health and safety and logistics plans.

Technical Aspects

Full detail design coordination was required on this specialist facility which also included for fenestration and structured glazing and full HVAC and restroom installations.

Professional Teams

Client: Asteral
Project Manager: Paul Ashton Ltd

Share
London

LEO, Nova North

London

Office Space in Town

Istanbul

Online retailer

Drop us a message or talk to one of our team

Contact us by entering your details below and we’ll get back to you at a time that suits you.

Prev Next